Issue Date: October 29, 2009

___________________________________________________________

Effective Date: October 29, 2009

___________________________________________________________

Expiration Date: October 29, 2010

___________________________________________________________

Subject: Norton Company SEC Class

Background: Pursuant to the Energy Employees Occupational Illness Compensation Program Act of 2000 (EEOICPA) and 42 C.F.R. Part 83, a petition was filed on behalf of workers from Norton Co. in Worcester, Massachusetts to be added to the Special Exposure Cohort (SEC).

The decision to initiate this petition occurred after the National Institute for Occupational Safety and Health (NIOSH) determined that it could not reconstruct a dose under 42 C.F.R. § 83.14. NIOSH submitted its findings to the petitioners and the Advisory Board on Radiation and Worker Health (“the Board”). On August 28, 2009, the Board submitted recommendations to the Secretary of Health and Human Services (HHS) to add to the SEC a class of employees who worked at Norton Co. in Worcester, Massachusetts.

On September 29, 2009, the Secretary of HHS designated the following class for addition to the SEC in a report to Congress.

All AWE employees who worked at Norton Company in Worcester, Massachusetts, from January 1, 1945 through December 31, 1957, for a number of work days aggregating at least 250 work days, occurring either solely under this employment, or in combination with work days within the parameters established for one or more other classes of employees included in the Special Exposure Cohort.

A copy of the Secretary’s letter to Congress recommending the designation is included as Attachment 1. Although Congress had the authority to reject the recommendation within a 30-day time frame, Congress took no action. Therefore, the SEC designation for this class became effective as of October 29, 2009, which was 30 days after the Secretary of HHS designated the class for addition to the SEC in the report to Congress.

While a new SEC class has been added for employees at Norton Company, NIOSH has determined that it is possible to reconstruct occupational medical dose and NIOSH intends to use any available external monitoring data that may become available for an individual claim (and that can be interpreted using existing NIOSH dose reconstruction processes or procedures). This means that for claims that do not satisfy the SEC membership criteria, a partial dose reconstruction is to be performed by NIOSH.

References: Energy Employees Occupational Illness Compensation Program Act of 2000, 42 U.S.C. § 7384 et seq.; 42 C.F.R. Part 83, Procedures for Designating Classes of Employees as Members of the Special Exposure Cohort Under EEOICPA; the September 29, 2009 letter to Congress from the Secretary of HHS in which Secretary Sebelius makes the designation.

Purpose: To provide procedures for processing SEC claims for workers at Norton Co. in Worcester, Massachusetts.

Applicability: All staff.

Actions:

1. This class encompasses claims already denied, claims at NIOSH for dose reconstruction, and future claims yet to be submitted.

2. The Division of Energy Employees Occupational Illness Compensation (DEEOIC) has prepared a list of cases with claimed employment at Norton Co. during the period of the SEC class. It includes pending cases, cases previously denied, and cases at NIOSH. It also includes specified and non-specified cancer cases. All cases on this comprehensive list must be reviewed by the district office(s) and by the Final Adjudication Branch (FAB) to determine whether the SEC class criteria are satisfied. This comprehensive list will be provided to the appropriate district offices and FAB under separate cover.

3. The district offices are to use the comprehensive list as the basis for an initial screening of cases associated with this Bulletin. The purpose of the screening is to make an initial determination on whether a case is likely to meet the criteria for inclusion into the SEC. A screening worksheet is included as Attachment 2. The worksheet must be completed for all cases on the comprehensive list. Upon completion, the worksheet is to be included in the case file. Based upon the initial screening, the cases on the list will be grouped into three categories: those likely to be included in the SEC class; those not likely to be included in the SEC class; and those for which development may be needed to determine whether the case can be accepted into the new SEC class. Claim status codes have been created in ECMS to reflect each of these categories: ISL (Initial SEC Screening, Likely SEC) for those likely to be included in the SEC class; ISU (Initial SEC Screening, Unlikely SEC) for those unlikely to be included in the class; and ISD (Initial SEC Screening, Development Needed), for which development may be needed in order to reach a determination on SEC class inclusion. A reason code corresponding to the SEC class status screening code has also been created, in this instance, 001 (Reviewed under Bulletin 10-01, Norton Company SEC). Once the worksheet is completed, the claims examiner (CE) is to select the appropriate claim status code and associated reason code from the drop down lists in ECMS B only. The status effective date for the ISL, ISU and ISD codes is to correspond with the completion date of the screening worksheet. Norton is an Atomic Weapons Employer (AWE). As such, there are no Part E coding implications.

The purpose of this initial screening is to assist the district offices in prioritizing claims poised for acceptance and for purposes of meeting operational plan goals. Once screening and prioritization is complete, claims adjudication proceeds in the usual manner. No matter the outcome of the screening protocol, each case must be evaluated formally for SEC inclusion and the decision recorded in ECMS. The initial screening step is only applicable to cases on the comprehensive list. It is not applicable to new claims submitted after the list is generated. These claims will be evaluated for inclusion in the SEC class in the general course of processing.

4. For cases on the comprehensive list at FAB, the designated CE2 Unit is to conduct the initial screening, worksheet and related coding.

5. The comprehensive list includes cases identified by NIOSH that should be considered for inclusion in the SEC class. NIOSH will return dose reconstruction analysis records for cases with specified cancers to the appropriate district office along with a CD for each case. The CD should contain all of the information generated to date, e.g., CATI report, correspondence, and dose information. Also included on the CD, in the Correspondence Folder, should be a copy of the NIOSH letter sent to each claimant informing the claimant of the new SEC class, and that his or her case is being returned to the DOL for adjudication. A copy of the NIOSH letter to affected Norton Company employees is included as Attachment 3. The CE must print out a hard copy of the NIOSH letter for inclusion in the case file.

Once a case file is returned from NIOSH (including cases that DEEOIC has withdrawn from NIOSH) to the district office for potential inclusion in the SEC class, the CE enters status code “NW” (NIOSH, returned without a dose reconstruction) in ECMS B. The status effective date for the “NW” code entry is October 29, 2009. However, the CE does not enter the status code until the DEEOIC office actually receives the NIOSH-returned dose reconstruction record.

There may be some cases on the comprehensive list that were not identified by NIOSH for potential inclusion in the SEC class, and consequently are still at NIOSH for a dose reconstruction. These cases must also be evaluated for inclusion in the SEC class in accordance with the procedures in this Bulletin. If any such case qualifies under the SEC class, the CE, through the Senior CE (SrCE), notifies the appropriate point of contact at NIOSH via e‑mail to return the dose reconstruction analysis records. The SrCE then prints a copy of the “sent” e‑mail (making sure the printed copy documents the date it was sent) for inclusion in the case file. The CE is to enter the status code “NW” with a status effective date of October 29, 2009. In addition, the CE must write a letter to the claimant advising that the case file has been withdrawn from NIOSH for evaluation under the SEC provision.

If the case is still at NIOSH and does not qualify under this SEC provision, based on the guidance provided in this Bulletin, then refer to instructions in Action #16.

6. For any cases identified as having a potential for compensability based on the new SEC class, the responsible CE is to review all relevant documentation contained in the case file, including any documentation that NIOSH may have acquired or generated during the dose reconstruction process.

7. Based on this review, the CE determines whether the employee has a specified cancer, as listed in the EEOICPA Procedure Manual Chapter 2-600.5. If the employee has a specified cancer, proceed to Action #8. If the employee does not have a specified cancer, proceed to Action #10.

8. If the employee has a specified cancer, the CE must determine if the worker was employed at least 250 workdays at Norton Company in Worcester, Massachusetts between January 1, 1945 and December 31, 1957. If the employee does not have 250 workdays at Norton Co., the CE should review the file to determine if additional days in the SEC can be found by combining days from employment meeting the criteria for other classes in the SEC and aggregating them together to meet the 250-workday requirement.

NIOSH has found no documentation to describe buildings and areas where radiological materials were used, or to limit such use to particular locations at the Worcester site. NIOSH has insufficient information to completely describe the source term, operational processes, worker movements, or potential for contamination spread at Norton Company; therefore, NIOSH assumes that the potential for exposure to radioactive materials existed in all areas of the Norton Company site in Worcester, Massachusetts during the period under evaluation.

9. Once the CE has determined the employee has a diagnosed specified cancer and meets the employment criteria of the SEC class, the CE proceeds in the usual manner for a compensable SEC claim and prepares a recommended decision.

If it is determined that the case does qualify for the SEC class, the CE, through the SrCE, notifies the appropriate point of contact at NIOSH via e-mail, so that NIOSH can close out their file. The SrCE then prints a copy of the “sent” e-mail (making sure the printed copy documents the date it was sent) for inclusion in the case file.

ECMS Coding Reminder: The “SE” (Confirmed as SEC Claim) status code must be entered into ECMS B with a status effective date equal to the status effective date of the recommended decision to approve.

For all claims where Norton Company employment is claimed, regardless of whether the SEC criteria are met, the SEC site code “Norton Company” must be selected under the “SEC/SEC Desc” field on the claim screen.

10. As discussed earlier, although HHS determined that it is not feasible for NIOSH to perform complete dose reconstructions for this class of employees, NIOSH has indicated that partial dose reconstructions are possible. Accordingly, for cases that had not been submitted to NIOSH and do not meet the criteria of the SEC class, the CE must refer these cases to NIOSH with a NIOSH Referral Summary Document (NRSD) to perform dose reconstructions. The CE enters status code “NI” (Sent to NIOSH) in ECMS B. The status effective date is the date of the Senior or Supervisory CE signature on the NRSD.

For those cases which were previously submitted to NIOSH for dose reconstruction and which were returned to the district office for consideration for inclusion in this SEC class, a new NRSD is not required. If it is determined that the case does not qualify for the SEC class, the CE, through the SrCE, notifies the appropriate point of contact at NIOSH via e-mail to proceed with the dose reconstruction. The SrCE then prints a copy of the “sent” e-mail (making sure the printed copy documents the date it was sent) for inclusion in the case file. The CE enters status code “NI” (Sent to NIOSH) into the ECMS B, effective the date of the e-mail requesting NIOSH to proceed with dose reconstruction. The e-mail should include a brief statement of why the case should proceed with dose reconstruction, e.g., non-specified cancer, insufficient latency period or does not meet the 250-workday requirement. In addition, the CE is to notify the claimant by letter that the case is returned to NIOSH for dose reconstruction and the reason(s) it does not qualify for the SEC class. The CE is to send a copy of this letter to NIOSH.

Upon receipt of the dose reconstruction report, the CE proceeds in the usual manner and prepares a recommended decision. The CE enters status code “NR” (NIOSH Dose Reconstruction Received) in ECMS B and selects the “PD” (Partial Dose Reconstruction) reason code. The status effective date is the date the dose reconstruction is date-stamped into the district office. The CE should not delete the “NW” (NIOSH, returned without a dose reconstruction) or “NI” (Sent to NIOSH) code already present in ECMS.

11. If the claim meets the SEC class employment criteria and includes both a specified cancer and a non-specified cancer, medical benefits are only paid for the specified cancer(s), any non-specified cancer(s) that has a dose reconstruction that resulted in a probability of causation (PoC) of 50 percent or greater and any secondary cancers that are metastases of a compensable cancer. In these instances, the CE drafts a recommended decision to accept the claim for the specified cancer (provided all criteria are met) and, if necessary, concurrently prepares a NRSD to NIOSH for a dose reconstruction for the non-specified cancer to determine eligibility for medical benefits. The CE enters status code “SE” (Confirmed as SEC claim) and the “NI” (Sent to NIOSH) code into ECMS B. The status effective date for the “SE” code is the date of the recommended decision to accept the specified cancer. The status effective date for the “NI” code is the date of the Senior or Supervisory CE signature on the NRSD.

12. If a claim has a final decision to deny based on a PoC of less than 50%, and a review of the evidence of record establishes likely inclusion in the SEC class, the case will need to be reopened. In the exercise of the Director’s discretion of the reopening process, the Director is delegating limited authority to the four District Directors to sign Director’s Orders for reopening. This delegated authority is limited to reopenings based upon evidence that a Norton Company employee meets the criteria for placement into the Norton Company SEC class as defined by this Bulletin. This delegated authority extends to any case potentially affected by this SEC class. However, if the District Director is unsure of whether the SEC is applicable to the case, the case should be referred to the National Office. A sample Director’s Order is provided in Attachment 4. The Director is retaining sole signature authority for all other types of reopenings not otherwise delegated. Once a Director’s Order is issued, the district office is responsible for issuing a new recommended decision.

13. For those cases which are reopened under the authority granted in this Bulletin, the District Director enters status code “MN” (NO Initiates Review for Reopening) in ECMS B with a status effective date as the effective date of this bulletin. For all reopenings per this bulletin, upon completing the Director’s Order to reopen the claim, the District Director enters status code “MD” (Claim Reopened – File Returned to DO) into ECMS B to reflect that the case has been reopened and is in the district office’s jurisdiction. (The “MZ” status code is not necessary). The status effective date of the “MD” code is the date of the Director’s Order. Please note that while the “MD” code is generally input by National Office staff, entry of this code has been delegated to the District Director, just as the authority to grant reopenings has been delegated in this specific circumstance.

14. Upon issuance of this Bulletin, FAB personnel must be vigilant for any pending Norton Company cases that have a recommended decision to deny. All cases on the comprehensive list identified in Action # 2 that are located at a FAB office must be reviewed for possible inclusion in the SEC class. If the employee worked at Norton Company during the time period specified, has a specified cancer, and meets the 250-workday requirement, the FAB is to reverse the district office’s recommended decision to deny and accept the case. The CE or FAB staff member enters status code “F6” (FAB Reversed to Accept, with appropriate Reason Code) into ECMS B to reflect the FAB reversal with a status effective date equal to the date of the final decision to approve. The CE or FAB staff person enters status code “SE” (Confirmed as SEC Claim) into ECMS B with a status effective date equal to the date of the final decision to approve.

For all claims where Norton Company employment is claimed, regardless of whether the SEC criteria are met, the SEC site code “Norton Company” must be selected under the “SEC/SEC Desc” field on the claim screen.

If no action is required, FAB must follow the instructions specified in action item 16 below, to indicate that a review of the case was completed.

Every effort should be taken to avoid a remand of a potential SEC claim to the district office. If FAB determines that the case cannot be approved based on the new SEC designation and that re-referral to NIOSH is appropriate (see action items 7, 8 and 10) the CE or FAB staff member must remand the case for district office action. The CE or FAB staff member enters status code “F7” (FAB Remanded) with “OTH” (No DO Error – Other) as the reason code, with a status effective date of the date of the remand.

15. The operational plan goal for completion of the action items in this Bulletin are as follows: The initial screening is to be complete for 90% of all cases on the comprehensive list within 30 days of the SEC class effective date. Recommended decisions are to be issued 45 days after the initial screening for 70% of those cases that are identified via initial screening as likely to be included in the SEC class (ISL) and those for which development may be needed (ISD). Recommended decisions are to be issued 60 days after the initial screening for 90% of those cases that are identified via initial screening as likely to be included in the SEC class (ISL) and those for which development may be needed (ISD).

16. If, after review or further development, the CE or FAB staff member determines that a case on the list does not require any action, the CE or FAB staff member must write a brief memo to the file indicating that the file was reviewed and noting the reason why no additional action is necessary. A case classified as not requiring any action is a case that does not meet the SEC criteria and there is no need to return it to NIOSH for partial dose reconstruction.

The CE must then code “NA” (No Action Necessary) and then select the appropriate reason code from the reason code drop down list. The “NA” coding is specifically tied to the SEC review list generated by DEEOIC and the “NA” code is restricted to ECMS B only because the SEC review list is derived from Part B data. For Norton Company cases that were reviewed under this Bulletin and require no additional action, the reason code that must be selected is “001” (Reviewed under Bulletin 10-01 Norton Company SEC) and be coded into ECMS B only. The status effective date of the “NA” code is the date of the memo to the file stating review is complete and the CE has determined there is no further action necessary. For those instances in which further development is necessary, the “NA-001” code is not entered initially. The “NA-001” code is only entered when the CE determines after development that the case does not meet the SEC criteria or there is no need to return it to NIOSH for partial dose reconstruction. For those cases on the DEEOIC list that were not withdrawn from NIOSH, the CE enters the “NA-001” code only after the CE determines that the case does not meet the SEC criteria. These cases remain at NIOSH for completion of a partial dose reconstruction.

Please note that if the CE discovers that the claimant(s) is/are deceased, the CE must still enter the “NA-001” code in addition to the closure code. The status effective date for the “NA” coding is the date of the memorandum to file.

Disposition: Retain until incorporated in the Federal (EEOICPA) Procedure Manual.

RACHEL P. LEITON

Director, Division of Energy Employees

Occupational Illness Compensation