1H00 Items Included

To be acceptable, a contractor’s VEVRAA AAP must include the below items listed in 41 CFR 60-300.44 and 41 CFR 60-300.45. It is the responsibility of COs to determine whether the contractor included all of the required items in the contractor’s VEVRAA AAP. Those items are listed in Section 1E02 of the FCCM, and the acceptability assessment of each item is described below.